Alpha Wind Casimcea Wind Farm

Alpha Wind Casimcea Wind Farm
Country Romania
Location Casimcea
Status Under construction
Commission date 2013 (expected)
Construction cost €300 million
Owner(s) Alpha Wind
CAS Regenerabile
Turbine information
Turbines 43 x 4.7 MW
Power generation information
Maximum capacity 201 MW
As of 19 December 2010

The Alpha Wind Casimcea Wind Farm is an under construction wind power project in Tulcea County, Romania. It will consist of an individual wind farm with 43 individual wind turbines with a nominal output of around 4.7 MW which will deliver up to 45 MW of power, enough to power over 131,000 homes, with a capital investment required of approximately €300 million.[1]

References

  1. ^ "Parc eolian de 200 MW la Casimcea" (in Romanian). green-report.ro. 2010-07-30. http://www.green-report.ro/stiri/parc-eolian-de-200-mw-la-casimcea. Retrieved 2010-12-17.